# Ford ships its first CATL-licensed LFP cells from $3B Michigan site

*Packs from the 20-gigawatt-hour Marshall plant head to Kentucky for pickup prototype testing under a CATL technology licensing pact.*

**Published:** November 19, 2026  
**By:** Mina Okoro  
**Section:** Batteries & Electric Vehicles — Cross-border  
**Format:** Breaking  
**Confidence:** medium  
**Source:** https://eastasiabrief.com/batteries-ev/ford-ships-first-catl-licensed-lfp-cells-3b-michigan-1564  
**Publisher:** East Asia Brief (https://eastasiabrief.com/)

---

## What to know

- Ford shipped its first Michigan LFP cells Nov. 19 for prototype Fathom trucks
- The $3 billion plant targets 20 GWh annual capacity using licensed CATL technology
- Commercial Fathom deliveries begin in Q4 2027, while federal 45X tax credit status remains unconfirmed

![Workers inspect wrapped pallets bearing Ford logos at a loading dock as battery packs are loaded for shipment. (AI-generated image)](https://eastasiabrief.com/media/2026-11-19-acc838aaea44.webp)
*Workers inspect wrapped pallets bearing Ford logos at a loading dock as battery packs are loaded for shipment. (AI-generated image)*

Ford Motor began shipping its first production lithium iron phosphate battery cells on Nov. 19, 2026, delivering Michigan-made packs to Kentucky for testing in low-cost electric pickup prototypes.

The shipment establishes Ford as the first automaker to manufacture lithium iron phosphate cells domestically for mainstream passenger vehicles, Lisa Drake, Ford vice president of electric vehicle programs, said.

The cells originate from BlueOval Battery Park Michigan, a wholly owned $3 billion subsidiary in Marshall spanning 2 million square feet. The site targets an annual capacity of 20 gigawatt-hours.

That planned output represents roughly one-fifth of Ford's projected North American cell requirements, providing enough capacity to assemble approximately 200,000 electric trucks each year once lines run at full scale.

The facility operates two assembly lines designed to produce 40 prismatic cells per minute, Alan Clarke, Ford vice president of advanced development projects, said during a plant tour.

Batteries represent about 40% of an electric vehicle's total production cost, making domestic cell output essential to protecting operating margins on entry-level models, Clarke said.

Truck shipments are heading directly to Louisville Assembly Plant in Kentucky. Workers there will install the prismatic packs into validation prototypes of the Fathom, Ford's forthcoming midsize pickup.

The Fathom serves as the lead model for Ford's Universal Electric Vehicle architecture. Ford aims to sell the truck at a base price of $28,350 before destination charges.

BlueOval Battery Park Michigan manufactures the cells using licensed chemistry, patents and manufacturing know-how from Contemporary Amperex Technology Co. Ltd. (CATL), the world's largest battery manufacturer.

Under the contract structure, CATL receives upfront licensing payments and recurring royalties tied to factory production volumes, while Ford retains complete operational control and 100% equity in the plant.

Engineers from CATL assisted Ford with equipment installation and staff training, but do not hold management positions or operational oversight at the Marshall complex, company filings show.

Ford structured the arrangement to navigate federal rules governing foreign entities of concern under the Inflation Reduction Act, company officials said in regulatory disclosures.

All critical minerals used in the Marshall cathode lines comply with federal sourcing guidelines, avoiding supply from designated foreign entities, Ford officials said.

The commercial launch introduces direct low-cost competition for South Korean cell manufacturers that have dominated early automaker supply agreements across North America.

SK On operates the BlueOval SK joint venture with Ford, a $5.8 billion enterprise building 129 gigawatt-hours of high-nickel battery capacity across sites in Kentucky and Tennessee.

Ford's decision to insource 20 gigawatt-hours of lithium iron phosphate chemistry shifts entry-level vehicle volume away from Korean nickel-cobalt-manganese ternary lines.

LG Energy Solution also faces heightened price rivalry as it expands domestic energy storage systems and automotive lithium iron phosphate capacity at its manufacturing hubs in Michigan and Arizona.

Standard lithium iron phosphate cells carry cathode material costs roughly 20% to 30% lower than high-nickel alternatives by eliminating refined nickel and cobalt from the formulation.

The technology partnership continues to face regulatory scrutiny in Washington. US Transportation Secretary Sean Duffy contacted Ford leadership in September expressing concern over engineering ties to Chinese battery companies.

House Select Committee on the Chinese Communist Party Chairman John Moolenaar previously demanded documentation regarding CATL licensing terms and potential federal tax credit eligibility.

Ford defended the operation, stating that domestic production retains manufacturing employment and technical capability inside the United States while accelerating electric vehicle adoption.

The plant currently employs more than 500 workers, with plans to expand staffing to 800 by December and reach 1,700 technicians at full ramp, Scott Davis, plant chief executive, said.

Ford has not disclosed the cell's gravimetric energy density or total pack capacity, and the US Department of the Treasury has not confirmed Section 45X advanced manufacturing credit eligibility.

Preorders for the Fathom open in early 2027, followed by initial commercial vehicle deliveries scheduled for the fourth quarter of 2027.

## Impact map

| Event | Korea | China | Japan | Global impact |
| --- | --- | --- | --- | --- |
| Ford LFP cell shipment | SK On and LG Energy Solution face price competition as Ford insources 20 GWh of entry-tier LFP capacity | CATL books licensing fees and equipment supply while bypassing US foreign entity equity curbs | Component and cathode suppliers see US automakers diversify chemistries away from high-nickel lines | Automotive supply chains accelerate low-cost LFP integration to deliver sub-$30,000 electric vehicles |

## In this story

- **Companies:** Ford Motor, Contemporary Amperex Technology
- **Tickers:** F, 300750.SZ
- **Exposed:** SK On, LG Energy Solution
- **Policy:** Subsidies, Local Content Rules
- **Impact:** Supply Chain, Cost Structure, Capex

## Primary sources

1. ford.com <https://www.fromtheroad.ford.com/us/en/articles/2026/ford-fathom-lfp-prismatic-battery-cells-ship>
2. cnevpost.com <https://cnevpost.com/2026/11/19/ford-ships-lfp-battery-cells-using-catl-tech/>
3. edaily.co.kr <https://marketin.edaily.co.kr/News/ReadE?newsId=01239846645647360>
4. eletric-vehicles.com <https://eletric-vehicles.com/ford/ford-ships-first-michigan-built-lfp-cells-for-28350-fathom-pickup/>
5. cnet.com <https://www.cnet.com/home/electric-vehicles/ford-begins-michigan-lfp-battery-manufacturing-fathom-ev-pickup/>

---

Cite as: East Asia Brief, "Ford ships its first CATL-licensed LFP cells from $3B Michigan site," November 19, 2026. https://eastasiabrief.com/batteries-ev/ford-ships-first-catl-licensed-lfp-cells-3b-michigan-1564